Yesterday, the new bridge over the Aqualena torrent was inaugurated in the presence of FVG Regional Councillor Riccardo Riccardi, FVG Civil Protection Central Director Amedeo Aristei, Forni Avoltri Mayor Sandra Romanin and Archest Technical Director Remo Livoni. The new bridge is part of the work to make the territory safe with funds from the Vaia bad weather emergency and was built after the demolition of the existing bridge, which had a pillar in the middle of the stream and two abutments that reduced the hydraulic section of the watercourse. Archest was in charge of the final design, executive design, safety coordination during the design and execution phases, and construction supervision of the work.